Head drive spool Change out
_
Rigged the motor/mount to hold in place and rigged trolley’s
to existing beams and when spool was unbolted it slid out were we could
transfer the load from chain falls to a crane outside of structure and just
swung it out and away. And OP for installation of the new one.

Prentice boom